What are the precautions for coating construction?

  • Categories:Coating Q&A
  • Author:
  • Origin:
  • Time of issue:2021-07-27
  • Views:0

(Summary description)High-performance coatings are usually two-component products. Each component should be thoroughly stirred before use, and then the base paint A component and the curing agent B component should be mixed according to the volume ratio shown in the manual and stirred evenly. The B component should be poured into the A component. Make sure that all equipment and containers are free of moisture.

What are the precautions for coating construction?

(Summary description)High-performance coatings are usually two-component products. Each component should be thoroughly stirred before use, and then the base paint A component and the curing agent B component should be mixed according to the volume ratio shown in the manual and stirred evenly. The B component should be poured into the A component. Make sure that all equipment and containers are free of moisture.

  • Categories:Coating Q&A
  • Author:
  • Origin:
  • Time of issue:2021-07-27
  • Views:0
Information

1. Coating construction-climate precautions

1.1 When the surface treatment of steel is carried out, it should be noted that when the ambient humidity is higher than 85% or the surface temperature of the steel is within 3℃ of the dew point, stop working, otherwise the water vapor will easily condense on the surface of the steel and cause rust, making the surface treatment unable to reach standard requirement.

1.2 Under normal climatic conditions, the steel after sandblasting should be immediately painted with the corresponding anti-rust primer within 4 hours. On a clean steel surface exposed to the air, a thin layer of rust will quickly form on the surface.

1.3 If the steel after sandblasting has been stored overnight, it must be lightly sandblasted again before applying the primer the next day.

1.4 The steel after sandblasting is strictly prohibited from contacting any form of water, including rain, condensation, etc., before applying the primer. Otherwise, light blasting must be done again before applying the primer.

 

Second, paint construction-paint precautions

2.1 High-performance coatings are usually two-component products. Each component should be thoroughly stirred before use, and then the base paint A component and the curing agent B component should be mixed according to the volume ratio shown in the manual and mixed evenly. At this time, the B component should be poured into the A component. Make sure that all equipment and containers are free of moisture.

2.2 After mixing, it can be used after being allowed to stand for a certain period of time according to the requirements of the instructions, and stirring shall be continued before use. Note that different temperatures require different standing times.

2.3 It can be diluted only when it is needed for construction. The instruction manual specifies the supporting diluent and its ratio. Do not over-dlute. The dilution ratio varies according to seasons and construction methods. (Note: Do not add diluent before mixing and standing period)

2.4 The amount of paint mixed at one time should be used up within the action time after mixing. This time has been explained in the instructions and varies with the temperature.

2.5 If the paint thickens during use, do not add too much thinner, but discard and mix with new paint.

 

3. Coating construction-precautions for painting

3.1 When performing traditional spraying, ensure that there is sufficient air pressure and flow to achieve the desired atomization effect.

3.2 Do not use in an environment that is more severe than the design requirements of surface treatment and anti-corrosion coating system.

3.3 The same surface should be sprayed at one time.

3.4 Use uniform, same direction and parallel wet coating, and each coating should cover 50% of the previous one. If necessary, cross spray can be done at the correct angle to avoid voids, missed coatings and pinholes.

3.5 All utensils should be cleaned with thinner immediately after use.

3.6 The next coating can be carried out after it has dried completely.

3.7 The thickness of the dry film of the coating shall be uniform and meet the design requirements, and the thinnest point shall prevail.

3.8 After the project is completed and passed the acceptance check, it should still be inspected regularly. If there is spot rust in the local area, it should be repainted in time to avoid small losses.

3.9 Pre-coating should be used at welding, bending, corners and corners to increase the coating thickness. Construction inspection For steel structure anticorrosive coating construction, in order to ensure that the construction quality meets the design requirements, each construction process including surface treatment must be inspected, mainly including surface treatment, after surface treatment, before coating construction, coating construction process and Several steps after the completion of construction.

 

Keyword:

Scan the QR code to read on your phone

推荐新闻

Wuxi Huadong Zindn Science And Technology Co.,Ltd.

Headquarters contact number:

Free hotline:

E-mail:

Add:

9th Floor of Wei chuang Building, No.999 Gaolang East Road,Wuxi, Jiangsu, China

Copyright © 2021 Wuxi Huadong Zindn Technology Co., LTD     京ICP证000000号

搜索
Search