Hot News

75 meters above the sky! ZINDN assists the anti-corrosion project construction of the Huaihai Road Bridge on the Beijing-Hangzhou Canal

  • Categories:Zindn News
  • Author:
  • Origin:
  • Time of issue:2019-10-19
  • Views:0

(Summary description)Recently, the Beijing-Hangzhou Canal Huaihai Road Bridge project received a good news, and the project was officially completed and officially opened to traffic! As for me (zinc) (shield) who participated in the anti-corrosion construction project of the bridge, looking at the 75-meter tower of the bridge, I am always full of pride and pride!

75 meters above the sky! ZINDN assists the anti-corrosion project construction of the Huaihai Road Bridge on the Beijing-Hangzhou Canal

(Summary description)Recently, the Beijing-Hangzhou Canal Huaihai Road Bridge project received a good news, and the project was officially completed and officially opened to traffic! As for me (zinc) (shield) who participated in the anti-corrosion construction project of the bridge, looking at the 75-meter tower of the bridge, I am always full of pride and pride!

  • Categories:Zindn News
  • Author:
  • Origin:
  • Time of issue:2019-10-19
  • Views:0
Information

Recently, the Beijing-Hangzhou Canal Huaihai Road Bridge project received a good news. The project was officially completed and officially opened to traffic! As for me (zinc) (shield) who participated in the bridge anti-corrosion construction project, looking at the bridge’s 75-meter tower height, always Full of pride and pride! This also records that ZINDN has taken another big step towards a milestone in the construction of bridge anti-corrosion engineering! Let us take a look at the demeanor of this "Pearl of the Huai River"!

 

 

How "bull" is the construction of the Huaihai Road Bridge on the Beijing-Hangzhou Canal

The Beijing-Hangzhou Canal Huaihai Road Bridge is located on the central axis of Huai'an City. The main body of the newly built bridge adopts a single-tower double-cable-plane cable-stayed bridge structure, two-way six lanes, the bridge width is 38 meters, and the bridge length is 663.76 meters. The main bridge adopts a spatially shaped arched steel main tower, the tower height is 75m, the tower width is 60m, and a total of 27 The total weight of the steel tower is 2,000 tons, of which the largest section weighs 200 tons. The steel tower sections are supported by lattice brackets, lifted by a 500t crawler crane, and installed with high precision at an altitude of 75 meters. The precision control of the bridge closure has reached the millimeter level!

 

 

 

The bridge is slightly shadowed. It’s worthy of absolute leverage! .76 meters. The main bridge uses a spatially shaped arched steel main tower. The tower is 75m high and 60m wide. There are 27 sections in total. The total weight of the steel tower is 2,000 tons. The largest segment weighs 200 tons. The steel tower sections are supported by lattice brackets, lifted by a 500t crawler crane, and installed with high precision at an altitude of 75 meters. The precision control of the bridge closure has reached the millimeter level!

 

ZINDN uses professionalism to make the "Pearl" shine brightly

We stick to quality, and we use professional measurement to make the quality of every section and every section of steel structure anticorrosion engineering indestructible. We use service to guard, and we use strength to guarantee every step of the bridge's anti-corrosion construction safety! Zinc shields give this "Grand Canal Bridge" new "life" and let this "Pearl" shine forever!

Scan the QR code to read on your phone

推荐新闻

Wuxi Huadong Zindn Science And Technology Co.,Ltd.

Headquarters contact number:

Free hotline:

E-mail:

Add:

9th Floor of Wei chuang Building, No.999 Gaolang East Road,Wuxi, Jiangsu, China

Copyright © 2021 Wuxi Huadong Zindn Technology Co., LTD     京ICP证000000号

搜索
Search